EP HVAC completes Shell project at Lonestar Marine Shelters (Galveston, Texas)

May 2012

EP HVAC completes Shell project at Lonestar Marine Shelters (Galveston, Texas)

Mars "A" TLP auxiliary Quarters for 76 people
72' x 40' USCG/ABS, three level building designed to .65 bar blast overpressure, A60/A0 fire rated envelope was completed with Lonestar in Galveston. Area rated stainless steel chillers were fitted with individual air handling plants on each level. Project included a turnkey controls package and all pipework for the Chilled Water System. (This project is part of the repairs to the platform after Hurricane Katrina damaged the facility.)


Halifax Website Design by:immediac